At 4:30 p.m. yesterday I decided I had to get this quilt loaded on my longarm. I finished the quilting at 6:45 p.m.
That gave me 15 minutes to trim it and cut the binding so I could sew it on while I watched MacGyver.
I did the organic straight line quilting this time.
I started the hand sewing and got one long side and the first corner done.
Earlier in the day I finished the hand sewing on the tablerunner binding.
It is 17.5" x 35".
I love the print I used on the back.
That gave me 15 minutes to trim it and cut the binding so I could sew it on while I watched MacGyver.
I did the organic straight line quilting this time.
I started the hand sewing and got one long side and the first corner done.
Earlier in the day I finished the hand sewing on the tablerunner binding.
It is 17.5" x 35".
I love the print I used on the back.