I wanted to finish making my pink blocks yesterday....there are 38 blocks in these piles. Now I can arrange the blocks of the second half of the quilt and get them sewn together.
I have been picking the tomatoes as soon as they start turning color so I can keep ahead of the squirrels.
When I was out pulling weeds and cutting volunteer trees I had to cut down one group of sneezeweed that was in an awkward place. I cut off the flowers and brought them inside. I also cut some zinnias but didn't take a photo of them yet.
It was hot yesterday but is supposed to be even hotter by the end of the week. The humidity is supposed to rise starting tomorrow. I'm probably done with yard work until next week so that means more sewing time.
I have been picking the tomatoes as soon as they start turning color so I can keep ahead of the squirrels.
When I was out pulling weeds and cutting volunteer trees I had to cut down one group of sneezeweed that was in an awkward place. I cut off the flowers and brought them inside. I also cut some zinnias but didn't take a photo of them yet.
It was hot yesterday but is supposed to be even hotter by the end of the week. The humidity is supposed to rise starting tomorrow. I'm probably done with yard work until next week so that means more sewing time.