We had our second monthly sewing day yesterday since the 4th Thursday falls on Christmas. My new project is a flannel quilt with 4.5" squares that I cut when I made the 4 flannel quilts at the beginning of this year. I cut a few more squares on Wednesday so I could make it a little larger. I will save this to work on in January at our next sewing day.
I finally made the decision that the Christmas stocking for my great grandson would be denim and machine embroidered. This design took over 2 hours to sew out. It had 22 thread changes so I was "on call" for a long time. I made 2 batches of Chex mix while it sewed.
I finally made the decision that the Christmas stocking for my great grandson would be denim and machine embroidered. This design took over 2 hours to sew out. It had 22 thread changes so I was "on call" for a long time. I made 2 batches of Chex mix while it sewed.