It was an errand day yesterday with a little time for quilting. I'm working on the Streak of Lightning in the basement on my straight stitch Babylock machine. I'm have about 1/4 of it quilted.
While watching TV at night I quilted on my Pfaff in the main level studio. I have about half of this one quilted.
While watching TV at night I quilted on my Pfaff in the main level studio. I have about half of this one quilted.