March finishes.......

I did very little sewing yesterday.  Since I wanted to show March finishes I knew I had to sew the border on this one.  I chose the mottled fabric rather than the stripe batik and made the border narrower than I showed when I was auditioning the 2 fabrics.  I made all of the blocks and sewed the top together in 10 days and then it took 3 weeks to finalize my decision on the border.
 
I only ended up with 2 quilts totally finished in March, both flannel quilts.

These 3 tops were completed and all were started in February or March.  The flannel quilt on the left just needed the paper pieced border in March.  The center one was made from start to finish in March and the one on the right was started in Feb. and finished in March.  That makes 12 finishes for the first quarter of 2013.  If I could keep up that pace I would have all of my tops quilted by the end of the year.  That is if I can keep the 'starts' under control.........