This is what I accomplished in the studio yesterday: left side strips on 24 African fabric blocks and 68 triangle squares.
I wanted to cut the Drunkard's Path pieces but I decided to go up into the attic since it was the perfect temperature for cleaning. I had 3 huge partially empty boxes and 1 full one that I went through. All 4 boxes are out of the attic now and also one big bag of trash. Two of the boxes were full of blue jeans. Everyone gave me their old jeans when I was teaching the Jeans Quilt class. A lot of the pairs were in great shape so they are being donated to Goodwill. A few pairs will go into another quilt that I will make this winter. The rest....well, they are still in the attic but all in one box.
I wanted to cut the Drunkard's Path pieces but I decided to go up into the attic since it was the perfect temperature for cleaning. I had 3 huge partially empty boxes and 1 full one that I went through. All 4 boxes are out of the attic now and also one big bag of trash. Two of the boxes were full of blue jeans. Everyone gave me their old jeans when I was teaching the Jeans Quilt class. A lot of the pairs were in great shape so they are being donated to Goodwill. A few pairs will go into another quilt that I will make this winter. The rest....well, they are still in the attic but all in one box.
