Today was cutting day on my triangle project. I'm using 3" finished triangles for this project. If I had chosen 2", 4" or 6" I have plenty of them already cut.
I want to join the Drunkard's Path quilt along at Vicki Welsh's blog, but it will be a few days before I can link up. Here is one that I made a couple years ago (still waiting to be quilted) and I have a tray of leftover pieces I can start with.
This was my other project, the bridesmaid dress. I have the overskirt and underskirt pinned to the right length (I hope!) and I had to cut off 4.5"
The easy part was the rolled hem. I hope I have the length right; that is the hard part. The wedding is tonight. This photo is a truer color.
I want to join the Drunkard's Path quilt along at Vicki Welsh's blog, but it will be a few days before I can link up. Here is one that I made a couple years ago (still waiting to be quilted) and I have a tray of leftover pieces I can start with.
This was my other project, the bridesmaid dress. I have the overskirt and underskirt pinned to the right length (I hope!) and I had to cut off 4.5"
The easy part was the rolled hem. I hope I have the length right; that is the hard part. The wedding is tonight. This photo is a truer color.
